




|
|
|
Custom Design
|
Experience with a wide variety of standard and custom equipment
|
|
CAD Design capabilities including electronic file exchange
|
|
Integration with existing equipment/systems
|
|
Onsite facility inspection to determine the best solution for each system
|
|
Design to comply with local air pollution control board requirements or EPA standards
|
|
|
Fabrication
|
16,000 square foot manufacturing area
|
|
90 ton Iron Worker, Shears, Rolls and Brakes
|
|
CNC Plasma cutting
|
|
Constant Inspection to ensure the highest quality and workmanship
|
|
Fabrication facilities located at same location as design group
|
|
|
Installation
|
Our own transportation and installation fleet including cranes and aerial equipment
|
|
Experienced crews
|
|
Fast Installation (usually 2 weeks or less)
|
|
Minimal lost production time can be achieved through off shift installations
|
|
Start-up Assistance and Customer Training
|
|
|